tr Skip to content
Black Friday FlowMattic for life, 12 payments of $33.25 Or $399 once. Nothing added for splitting Ends in --Days --Hrs --Min --Sec See the deal

Create Switchy links for new Notion database items

Each new item in a Notion database you pick gets a Switchy short link, built from a URL you map from the item, so links for campaigns, posts or products are ready as soon as the entry exists.

Notion Switchy.io

2 steps Setup ~5 min Used on 667 sites Free to import

The Create Switchy links for new Notion database items workflow on the FlowMattic canvas, with 2 steps across Notion, Switchy.io
The workflow as it appears in the builder after import. Each step opens for editing.

What this workflow does

Teams that plan content or campaigns in Notion often need a short, trackable link for each entry. Making those links by hand means switching to Switchy, pasting the URL and copying the result back, one item at a time. This workflow creates the link for you when the item is added.

The Notion New Database Item trigger fires when an item is created in the database you connect. FlowMattic passes the item's properties on to Switchy.io, where the Create Link action makes a new short link. You map which property holds the destination URL, so each Notion row needs that URL filled in.

As imported, the short link is created in your Switchy account and stays there. Nothing writes it back to Notion or posts it anywhere, so add a step if your team needs to see it next to the entry. Every new item runs the workflow, including items added without a URL. Task History shows what Switchy received and the link it returned.

Content calendar in Notion

Each blog post or video you add to a Notion content calendar gets a Switchy link, ready to use in social posts and newsletters.

Campaign tracker for a marketing team

A new campaign row with a landing page URL produces its own short link in Switchy, so every campaign has a link you can track.

Product launch checklist

Each product page added to a Notion launch database gets a short link that the team can paste into announcements.

How this workflow runs

What happens at each step once the workflow is on, and what you need before you import it.

  1. Step 1Trigger
    Notion New Database Item

    Fires when an item is created in the Notion database you connect. The item's properties become values you can map, including the column that holds the link's destination URL.

  2. Step 2Action
    Switchy.io Create Link

    Makes a new short link in your Switchy.io account. Map the destination URL from the Notion item. A test run shows the link Switchy returns, which later steps can use.

What you need

  • FlowMatticCore
  • Notion AccountAccount
  • Switchy.io AccountAccount

After importing, map your own data. To keep the template universal, not every step is pre-filled. Open each step in the builder and connect your accounts and fields (channels, lists, sheets, recipients) before you switch the workflow on.

Make it yours

Changes worth making after you import it.

  • Add a Filter after the trigger that continues only when the Notion URL property is not empty, so items created before anyone adds a link don't send blank requests to Switchy.
  • To see the short link inside Notion, add a Notion Update Database Item step at the end and map the link Switchy returns into a URL property on the same item.
  • Create one test item in the Notion database after import, so FlowMattic captures its properties and you can map the destination URL.

Questions about this workflow

Does every new Notion database item get a Switchy link?

Yes, as imported. There is no Filter, so each new item runs the workflow. An item without a URL still reaches Switchy, which is why a Filter on the URL property is worth adding.

Will editing a Notion item create another Switchy link?

The trigger is for items created in the database, not edits. Changing an item that already exists does not start a new run.

Where can I find the Switchy link after it is made?

In your Switchy.io account. The template does not copy it anywhere else, so add a step if you want it saved in Notion, a sheet or a message.

Can I use one Notion database for several link types?

Yes. Map whichever property holds the destination, and use a Filter or Router on another property if different kinds of items need different handling.

Import this workflow into your WordPress site

Download the JSON, import it from the Workflows screen and connect your accounts. Every run stays on your server, with no per-task fees.

30-day money-back guarantee Unlimited workflows and runs Self-hosted

Customers who run it every day

Rated 4.8 out of 5 by customers
Read more reviews

Great product, saves a lot of money on automation subscription. Also great support and response from the team.

Team Genius

Flowmattic is one of most advanced integration platform , A perfect alternative of zapier with unlimited task and founder and his team always ready to stand even at 2am midnight so really dedicated